
OPERATING, SERVICE AND MAINTENANCE MANUAL MODEL RPH-45,000T INDUSTRIAL PLANETARY WINCH Intended Purpose: Vehicle Recovery and Pulling of Loads
7 5. Pull drum assembly #1 upward from end bearing #10. Remove quad-rings #41 from grooves in drum bushings. Remove input shaft #11, clutch springs
8 6. Remove output coupling #6 and coupling shaft #7 from end bearing #10. Examine bearings #13 pressed in output coupling for signs of wear. Replac
9 RE-ASSEMBLY 8. NOTE: DETERMINE MOUNTING CONFIGURATION OF WINCH (R.H. or L.H. MOUNTED) BEFORE ATTACHING UPRIGHT FRAME TO WINCH, TO ASSURE PARTS AR
10 10. Set gasket #35 into place on gear housing end bearing #10. Place ring gear onto end bearing, aligning holes in ring gear with holes in gasket
11 12. Gently tap key #5 into keyway of input shaft #11. Liberally apply grease to shoulder of input shaft. Place 1-3/4 OD washer #27 over end of sha
12 14. Apply Permatex to thread of plug #43. Thread plug into tapped hole in bottom of gear housing end bearing #10. Pour approximately 4.75 pints of
13 WINCH MOUNTING CONFIGURATIONSANGLE SIDECONFIGURATIONR. H. MOUNTINGCHANNELSIDEANGLE SIDECONFIGURATIONL. H. MOUNTINGCHANNEL SIDE
14 MOTOR CONTROL VALVE DETAIL1.6241,1.8120,6WINCH1 1/16-12 SAE STRAIGHT THREADO-RING PORT (TYP. 2 PLACES)264,310.4120.25514,3101,64.00446,017.5622
411239813LONGEST SPLINES24613243493450181834e34d34e34a3234c5035427382234b2414546102743144130332125153726204719RPH 45,000T WINCH1748194029113195
16 PARTS LIST – RPH 45,000T ITEM QTY. PART # DESCRIPTION ITEM QTY. PART # DESCRIPTION 1 1 234156 DRUM ASSEMBLY 28 4 418453
LIMITED WARRANTY RAMSEY WINCH COMPANY Post Office Box 581510 Tulsa, Oklahoma 74158-1510 Telephone: (918) 438-2760 FAX: (918) 438-
TABLE OF CONTENTS INTRODUCTION... 1 WARRA
1 *Rated line pullper layer(at 25 GPM)*Cable capacity*Line speedLAYER OF CABLE 1 2 3
2 WINCH FRAME MOUNTING Use (8) 3/4" diameter grade 5 or better bolts to attach mounting frame to the wrecker. CABLE INSTALLATION 1. Unwind cab
3 BASED ON 9.6 CU. IN./REV. MOTORLINE PULL-FIRST LAYER (LB.)WORKING PRESSURE, PSI10,000020,00015,00025,0002,000 3,00028,10015LINE SPEED-FIRST LAYER (
4 MAINTENANCE Adhering to the following maintenance schedule will keep your winch in top condition and performing as it should with a minimum of repa
5 INSTRUCTIONS FOR OVERHAUL DIS-ASSEMBLY 1. Drain oil from gear housing #10 by removing pipe cap #43 from pipe nipple in end bearing. Remove reducer
6 3. Remove brake assembly screws #50 from brake #34a to access mounting screws #18 attaching brake adapter plate #34d to end bearing #9. Caution: Br
Kommentare zu diesen Handbüchern